PROJECTS

 

 

 

EFG Rapotín BPS

EFG Rapotín BPS was established in 2012 to build up one of the first waste AD plant in the Czech Republic. The plant has been in operation for five years now with a processing capacity of 30 thousand tons of biodegradable waste per year.

It potentially generates electricity and heat for approximately two thousand households. The facility has several sources of income. The first source is the waste disposal, the subsequent source of income is the sale of produced commodities.

From an economic point of view, EFG Rapotín BPS claimed an investment of over CZK 280 million. The current market value of the project is CZK 334 million.

Processing capacity

  • 30 ths. tonnes per year

Energy production

  • Energy production for 2 ths. households

Sources of income

  • waste processing
  • sale of electricity
  • sale of heat
  • sale of biomethane

    EFG Rapotín BPS

    EFG Rapotín BPS was established in 2012 to build up one of the first waste AD plant in the Czech Republic. The plant has been in operation for five years now with a processing capacity of 30 thousand tons of biodegradable waste per year.

    It potentially generates electricity and heat for approximately two thousand households. The facility has several sources of income. The first source is the waste disposal, the subsequent source of income is the sale of produced commodities.

    From an economic point of view, EFG Rapotín BPS claimed an investment of over CZK 280 million. The current market value of the project is CZK 334 million.

    Processing capacity

    • 30 ths. tonnes per year

    Energy production

    • Energy production for 2 ths. households

    Sources of income

    • waste processing
    • sale of electricity
    • sale of heat
    • sale of biomethane

      EFG Waste logistic

      EFG Waste logistic is strategically integrated into the EFG holding as a waste collecting partner. The company provide us with the distribution as well as the collection of own biowaste containers in the collection area – Olomouc Region.

      EFG Waste logistic also binds waste from the transhipment point in South Moravia to ECR Rapotín. The company is to provide 10 ths. tons of waste annually.

      The actual car park

      • collects waste
      • offers and deploys collecting receptacles and containers
      • provides waste separation
      • transfers biodegradable
        waste to ecological energetic
        disposal

      EFG Waste logistic

      EFG Waste logistic is strategically integrated into the EFG holding as a waste collecting partner. The company provide us with the distribution as well as the collection of own biowaste containers in the collection area – Olomouc Region.

      EFG Waste logistic also binds waste from the transhipment point in South Moravia to ECR Rapotín. The company is to provide 10 ths. tons of waste annually.

      The actual car park

      • collects waste
      • offers and deploys collecting receptacles and containers
      • provides waste separation
      • transfers biodegradable waste
        to ecological energetic disposal

      EFG Green gas

      EFG Green Gas focuses on the efficient gain and utilization of biogas produced in AD plants. We primarily focus on biogas upgrading to biomethane, selling, and distributing it.

      The first project of EFG Green gas will be the installation of a biogas upgrading unit for biomethane in an AD plant at ECR Rapotín BPS. By installing the biogas treatment unit on biomethane, we achieve an increase of economic efficiency of utilization biogas of 30%.

      An achievement of required national savings on emissions of CO2 is a part of our strategy. We see the way mainly in increase the utilization of biomethane in transport and in development of the market with this „green gas“.

      Biomethane = natural gas

      • suitable for utilization as a CNG

      Example

      • 30 ths. tons of waste per year = CNG for 3 ths. cars with 8 ths. kms per year driven

      EFG Green gas

      EFG Green Gas focuses on the efficient gain and utilization of biogas produced in AD plants. We primarily focus on biogas upgrading to biomethane, selling, and distributing it.

      The first project of EFG Green gas will be the installation of a biogas upgrading unit for biomethane in an AD plant at ECR Rapotín BPS. By installing the biogas treatment unit on biomethane, we achieve an increase of economic efficiency of utilization biogas of 30%.

      An achievement of required national savings on emissions of CO2 is a part of our strategy. We see the way mainly in increase the utilization of biomethane in transport and in development of the market with this „green gas“.

      Biomethane = natural gas

      • suitable for utilization as a CNG

      Example

      • 30 ths. tons of waste per year = CNG for 3 ths. cars with 8 ths. kms per year driven

      EFG Engineering

      EFG Engineering is a technology company that carries out projects of modern energy solutions in the Czech Republic focused primarily on biogas. EFG Engineering’s specialized team is mainly focused on rebuilding agricultural AD plants into waste ones. And further on the implementation of biogas treatment projects for biomethane.

      EFG Engineering

      EFG Engineering is a technology company that carries out projects of modern energy solutions in the Czech Republic focused primarily on biogas. EFG Engineering’s specialized team is mainly focused on rebuilding agricultural AD plants into waste ones. And further on the implementation of biogas treatment projects for biomethane.

      MOSTEK energo

      The main reason for the acquisition of the MOSTEK Energo biomass power plant is the possibility of using the premises for other innovative projects in which heat and electricity produced directly by the power plant will be used. One of the main tasks is the use of waste heat, with which we have plans in synergy with our other projects.

      The sources of fuel are diversified because of security of continuous supplying the plant with fuel, where the construction of the boiler enables to combust variable types of fuel.

      MOSTEK energo

      The main reason for the acquisition of the MOSTEK Energo biomass power plant is the possibility of using the premises for other innovative projects in which heat and electricity produced directly by the power plant will be used. One of the main tasks is the use of waste heat, with which we have plans in synergy with our other projects.

      The sources of fuel are diversified because of security of continuous supplying the plant with fuel, where the construction of the boiler enables to combust variable types of fuel.

      Biomethane CE

       The foundation of Biomethane CE stays on the experience gained in the field of biomethane technologies and the building of business relationships with foreign business partners.

      Biomethane CE is the exclusive sales representative of the French manufacturer of membrane separation technology, Prodeval. It is ready to supply this technology to AD plants in the Czech Republic and Slovakia.

      Biomethane CE

       The foundation of Biomethane CE stays on the experience gained in the field of biomethane technologies and the building of business relationships with foreign business partners.

      Biomethane CE is the exclusive sales representative of the French manufacturer of membrane separation technology, Prodeval. It is ready to supply this technology to AD plants in the Czech Republic and Slovakia.